In this stage, we worked on taking the pod apart and worked on making it better and figuring out what modifications we would make on it. We made blueprints and worked on calculations for electricity schematics. It was a jumble of planning and a little constructing stuff. We worked on figuring out how to use what the previous people put on it. We eventually figured out how to use the components that the previous group had put on it, and when we figured out that it wasn't a very good system and it kept breaking down, we tore almost everything out and replaced it with our own system, which we needed to improve upon, since when we first created it it wasn't much better than the previous groups'. We finally finished all the planning and schematics and blueprints and moved onto stage two.